AIR-LAND SURVEYS

Construction of concrete sidewalk under US-127

Advertisement

pdf

Plan Holder List

pdf

 

The Project consists of extending the existing 12-inch water main on the west side of Saginaw Road north of McCandlish Road to the existing 8-inch water main at Pepperwood Drive. An 8-inch water main is also proposed to be conducted to create a loop in the Heritage Park Development. The work includes open cut utility installation, bore and jack utility installation, and restoration.

Advertisement

pdf

Plan Holder List

pdf