The Project includes exposing 147 water service lines, 18 inches each side of the curb stop box, at various locations across the city with hydro excavation methods and restoring any disturbed areas to their original condition with new materials. Where lead services are found, the Contractor will install a new service as directed. The purpose of this project is to identify water service line material to populate an inventory list in accordance with Michigan Department of Environment, Great Lakes, and Energy (EGLE) lead and copper rule.
Bid Tabulation
The Vienna Township parking lot improvements (Section 1) include replacing existing HMA pavement, grading, aggregate base, select concrete curb and gutter replacement, storm sewer upgrades, pavement markings, and turf establishment. The Vienna Township BDA parking lot improvements (Section 2) include removing the existing driveway and construction of a new parking lot, driveway approach, storm sewer, concrete curb and gutter, pavement markings, site lighting, landscaping, and turf establishment.
Bid Tabulation
The Project includes replacing approximately 2,900 feet of 12‐inch sanitary sewer with 21‐inch‐diameter sanitary sewer with open cut sanitary sewer installation, bore and jack sanitary sewer installation, and restoration.
Bid Tabulation
The Project includes resurfacing of West Flint Street from Aloha Street to North State Street (M-15), Aloha Street from West 2nd Street to West Flint Street, East and West 2nd Street from Genesee Street to Main Street, East 3rd Street from M-15 to Main Street, East 4th Street from M-15 to North Davison Street, and Lexington Street from South Dayton Street to M-15. Work includes cold milling, pavement removal, sidewalk removal, storm sewer replacement, water main, curb and gutter, HMA paving, concrete sidewalk, ADA sidewalk ramps, signs, traffic signal upgrades, and restoration. .
Bid Tabulation
The Project includes parking lot reconstruction consisting of HMA base crushing and shaping, earthwork, drainage improvements, new HMA pavement, markings, and other related work.
Bid Tabulation
The Project includes rehabilitation of Louisa Street from Saginaw Street to Walter Street.
Bid Tabulation
The Project includes milling and replacing asphalt parking lot, and total reconstruction.
Bid Tabulation