Sump Pump and Footing Drain Program

Project Contacts

As part of the grant process Township consultants, Rowe PSC and Potter Consulting, developed a Project Plan to determine the most cost effective method of removing additional clean water (I & I) from the sanitary sewer system. This plan outlines several alternatives for removing clean water from the system. The most cost effective Alternative was determined to be the Sump Pump and Footing Drains Disconnection Alternative. In an effort to involve the residents affected by the project a public information meeting was held on February 11, 2009, the Project Plan was public noticed on February 19, 2009, and a Public Hearing will be held on March 24, 2009 at the Township Hall.


Jack Wheatley Rowe PSC
Address:4400 South Saginaw St. Suite 1200 Post Office Box 3748 Flint, Michigan 48502
Email:jwheatley@rowepsc.com
Phone:810-341-7500
Fax:810-341-7573

Daniel Potter (Potter Consulting)
Address:4468 Mapleleaf Drive Grand Blanc, Mi 48439
Email:dan53053@comcast.net
Phone:810-577-6849
Fax:810-715-2595



Valid XHTML 1.0 Transitional